Solar + battery storage for NSW businesses

Your factory works hard.
Your power bill could work smarter.

Buy less electricity. Reduce costly demand peaks. Put solar and battery storage to work for your business.

Find out where I could save →

A short enquiry. We’ll follow up for your electricity bill.

Australian business since 2010• BESS4 and BESS5 ACP• 346 MWdc NSW project experience

See where the savings come from

One system.
Four ways to lower your bills.

Swipe to explore four ways to save

THE BRAIN BEHIND YOUR SAVINGS

Your power. Working together.

The energy management system (EMS) coordinates solar, batteries and grid power around what your business needs.

EXAMPLE · DAYTIME

Solar runs production. Stored power charges your fleet.

Solar power → productionStored power → vehicle chargingSolarGenerating nowGridAlmost no power boughtBatteryCharged overnightFactory loadsPowered by solarTruck chargingPowered by batteryEMSMonitors & directs

Power flowEMS monitoring & control

Almost no grid power needed in this example.

Illustrative operating moment, not a daily result. Actual flows depend on solar output, stored energy and site demand.

ANOTHER EXAMPLE · AN EMS INSTRUCTION“A demand peak is expected in 40 minutes.”

The EMS tells the battery to stop discharging and save power to help cover the peak.

NSW battery incentives

Could incentives reduce
your upfront cost?

We assess BESS4 or BESS5 eligibility alongside your potential electricity savings, before you commit to a system.

Does my site qualify?

We check your business, battery proposal and the relevant activity requirements.

What could it be worth?

We assess the potential incentive contribution for your project.

Who handles the evidence?

As an ACP, we plan the required records alongside approvals, design and delivery.

Eligibility and incentive value are project-specific. Approval and a fixed rebate are not guaranteed.

Check my project’s potential →

From proposal to switch-on

Who makes it all happen?

One coordinated delivery plan, with the difficult parts addressed early.

Incentive requirements

Build the evidence record as the project progresses.

Grid connection

Plan for your network’s limits, approvals and required testing.

Construction & commissioning

Coordinate installation and make the equipment work as one system.

After installation

Will I know it’s working?

See your system.

Clear monitoring of generation, battery use and system performance.

Understand the results.

Agree how performance is reported and, where included, savings are checked against a defined baseline.

Know who to call.

Defined maintenance, fault response and ongoing service responsibilities.

Monitoring, reporting and service commitments are set out in your proposal.

Real projects. Real delivery experience.

We’ve done the hard parts.

Aerial view of Wollar Solar Farm

Wollar Solar Farm

346 MWdc · NSW

From early works in 2021 through EPC, grid connection and commissioning to ongoing operations and maintenance.

Project scope & evidence

Sunterra Energy Pty Ltd is the EPC contractor. A three-year O&M agreement includes defined plant-performance requirements. Project-specific commitments do not automatically apply to other sites.

Owner’s timeline ↗
NSW planning record · SSD-9254 ↗

Solar array at Binduli Hybrid Project Norton Gold Fields

Binduli Hybrid Project
Norton Gold Fields

3 MW solar + 5 MWh battery

Solar, batteries and diesel generation integrated for a working mine. Commissioned in August 2026.

Project scope & context

Joint EPC delivery: Long King supplied equipment; Sunterra’s scope covered design, construction, project management, commissioning and diesel-generator control integration.

Kalgoorlie, WA. An off-grid project; NSW connection and incentive eligibility are assessed separately.

Explore the Binduli project →

Start with your business

Where could your
business save?

Let’s look at your electricity costs and what solar and storage could change.

1Tell us how to reach you.
2We follow up for your electricity bill.
3We discuss savings and incentive potential.

No bill upload now. No purchase commitment.

No bill upload is needed now. We will arrange this during follow-up.

Our team will follow up to discuss your site. No purchase obligation.

Before you get started

Can I add a battery to existing solar?

We can assess your existing system, electricity use and connection constraints before recommending an addition.

Can my business run independently of the grid?

Solar and storage can reduce grid reliance. Backup and off-grid operation require specific design; they are not automatic battery features.

How much will we save?

That depends on your bill, tariff and load profile. Detailed modelling uses interval data and clear assumptions, rather than a standard percentage promise.

Sola Now Pty Ltd trading as Sunterra · NSW Electrical Contractor Licence 369999C

Call Now Button