Commercial · Battery Only

Add storage. Work with the site you have.

Add a battery system without installing a new solar array. Start with your existing equipment, electricity tariff and operating loads to assess a suitable storage design.

Discuss a commercial project

Battery-only system concept
Grid / existing solar
Battery + storage inverter
Business loads

Concept diagram. Connection design, equipment and operating modes are specified for each project.

What battery only means

No new solar array required.

A battery-only project focuses on storage and its power-conversion equipment. It may work alongside existing solar, or use permitted grid charging where the selected system supports it.

Add to existing solar

Assess a compatible retrofit before deciding whether any existing inverter or switchboard work is required.

Review charging costs

Compare charging windows, losses and the complete tariff against when stored energy would be used.

Assess demand and backup

Check interval data for demand peaks. If backup is needed, define the supported circuits and switching arrangement separately.

Battery Only packages

Three-phase storage for your site.

With 30kWh Growatt APX Batteries

Three Phase 30kWh Battery System

1 × Growatt MID30KTL3-XH
With 30kWh Growatt APX Batteries

A three-phase battery system designed around your existing equipment and the way your site uses electricity.

Ask about this package

Three Phase · 30kWh APXGrowatt MID30KTL3-XH inverter and APX battery product combination supplied by Sunterra
Product combination illustration. Architectural background shown for inspiration.

Battery energy capacity is nominal. Compatible battery controls, charging arrangements and any optional backup work are confirmed in the site proposal.

Our equipment

Growatt MID30KTL3-XH. APX battery storage.

The inverter and batteries behind the Three Phase 30kWh Battery System.

Growatt MID30KTL3-XH

Growatt MID30KTL3-XH

A three-phase battery-ready inverter for compatible Growatt APX P-S2 storage. We specify the battery controller and connection arrangement together.

MID XH series datasheet (PDF) ↗

Growatt APX Battery

Growatt APX Battery

Modular high-voltage battery storage. This package includes 30kWh nominal capacity, with compatible controls selected for the MID30KTL3-XH system.

APX HV datasheet (PDF) ↗

Explore Growatt Products →

Case Studies

How the 30kWh package could fit a site.

Growatt MID30KTL3-XH and APX battery product combinationProduct illustration · Application example
Application example · Three-phase battery storage

Keep the site. Add three-phase storage.

For a three-phase site reviewing storage alongside existing equipment, this example uses 1 × Growatt MID30KTL3-XH with 30kWh Growatt APX Batteries. The operating plan starts with the site’s load profile and existing system.

MID30KTL3-XH30kWh nominal APX storage

Illustrative application of the listed package, not a completed customer installation or a measured savings claim.

Explore this application
  1. Review the existing site. Check the electricity supply, switchboard, installed solar and when the business uses power.
  2. Match the equipment. Specify compatible APX controls, metering and the connection arrangement for the MID30KTL3-XH.
  3. Set the operating plan. Assess charging sources, available surplus and the full tariff before selecting a schedule.
  4. Define the scope. Confirm installation, commissioning, monitoring and any separately designed backup duties.

Site suitability and expected outcomes require an individual assessment.

Discuss this application →

Project assessment

Start with the operating requirements.

  1. Site information

    Share recent bills, interval data, supply details and any existing solar, battery or generator equipment.

  2. Loads and priorities

    Identify operating hours, large loads, backup priorities and planned equipment.

  3. System design

    Review charging sources, control strategy, equipment compatibility and connection requirements.

  4. Scope and delivery

    Confirm models, installation work, commissioning, monitoring and ongoing support in the proposal.

Common questions

Is this a fixed package?

Commercial systems are selected for the site. Capacity, equipment, price and operating strategy are confirmed in the project proposal.

Does battery only mean no solar can be present?

No. It means the project does not need to add a new solar array. Existing solar can be assessed as part of a compatible retrofit.

Will the whole site run during a blackout?

Only if that backup scope is specifically designed and included. Connected loads, switching arrangements, available inverter power and battery reserve determine what can operate.

Is a micro-grid the same as an off-grid system?

A micro-grid describes coordinated local generation, storage and loads. It may be grid-connected or standalone; island operation requires the appropriate controls and protection.

Your next step

Build the brief for your site.

Bring your bills, site information and operating priorities to the conversation.