Binduli Hybrid Power Station · Stage II

Utility · Hybrid Projects

Different energy sources.
One coordinated system.

Integrate solar, storage and existing generation around real operating loads, with controls and commissioning that make the components work together.

Binduli Hybrid Power Station · Stage II

Utility Projects  /  Hybrid Projects
System integration

Start with how the site already operates.

Existing generation

Review generator capability, control platforms, network conditions and the required operating reserve.

New solar and storage

Match new generation and energy storage to load timing, available charging energy and the site’s objectives.

Coordinated control

Establish the EMS interfaces, operating limits, communication paths and response to changing conditions.

A coordinated operating concept

Energy paths and controls, planned together.

Solar generation

Battery + PCS

Site / grid interface
EMS coordinates solar, storage and existing generation

Concept only. Controls coordinate the equipment; energy does not flow through the EMS. Electrical topology and operating modes are project-specific.

When solar is available

Available PV can supply part of the site demand and charge storage within the agreed limits. Dispatch depends on load, battery state and required reserve.

When a large load starts

Suitably designed power conversion and controls can support changing site conditions. The response must be tested against the actual load and network requirements.

When solar output falls

Storage and existing generation are coordinated around charge limits, operating reserve and the site’s supply priorities.

Project experience

Integration at an operating mine.

Binduli Hybrid Power Station project photographReal project · Binduli
Western Australia · Operating mine

Binduli Hybrid Power Station

Solar, storage and existing diesel generation integrated at Norton Gold Fields. Sunterra’s role covered design, construction, project management, commissioning and generator-control integration.

3.2 MW solar PV2.5 MW PCS / 5 MWh storageExisting 11 kV network

Stage II project figures. Joint EPC delivery included Long King supplying equipment.

Explore the project story →

From installed to integrated

Commission the complete operating system.

Map the interfaces

Trace existing controls, equipment data and network boundaries.

Coordinate the design

Resolve generation, storage, protection and communication requirements.

Verify staged operation

Test commands, response to communications faults and configured operating limits.

Handover the system

Record settings, responsibilities, operating modes and maintenance needs.

Common questions

The controls matter as much as the equipment.

Does a hybrid project remove the need for diesel?

Not necessarily. Existing generation can remain part of the operating design and reserve strategy. The appropriate mix depends on the site.

Does fewer generators online mean the same percentage reduction in fuel?

No. Generator count and fuel use are different measures. Any fuel or cost outcome needs site operating data and an appropriate comparison.

How does this relate to Commercial Micro-grid?

Both involve system coordination. The Utility discussion focuses on larger or more complex project interfaces; the actual engineering scope follows the site rather than the page label.

Your next energy project

Start with the site. Define the scope.

Share your project stage, electrical interfaces, available studies and operating priorities. Let’s discuss the right next conversation.

Discuss your project →