Storage with a defined
operating purpose.

Start with the required power, energy, duty cycle and connection. Then coordinate batteries, power conversion, controls and site delivery around that brief.

Binduli · Battery and power-conversion equipment

Utility Projects  /  BESS
Battery Energy Storage Systems

Define the job before choosing the size.

MW describes power; MWh describes stored energy. Both need to be matched to the operating requirement and project constraints.

Power & energy duty

Identify the required dispatch power, energy window, operating duration and charging opportunity.

Connection & controls

Define network interfaces, protection, plant controls, communications and metering.

Site & operating readiness

Coordinate site layout, access, equipment installation and the asset’s safety and maintenance requirements.

How the parts connect

One asset. Several critical interfaces.

Battery + BMS

Power conversion system

Transformer / grid interface
EMS / plant controls · Monitoring, dispatch and operating limits

Concept only. Controls coordinate the equipment; energy does not flow through the EMS. Electrical topology and operating modes are project-specific.

Delivery workstreams

Coordinate more than the battery enclosure.

Establish the brief

Record operating modes, location, connection studies and existing infrastructure.

Resolve the interfaces

Define equipment selection, power conversion, protection and control boundaries.

Plan construction

Coordinate civil works, electrical balance of plant, access and equipment logistics.

Test and hand over

Verify agreed functions, document settings and establish operating responsibilities.

Storage within a hybrid project

A real integration reference.

Binduli Hybrid Power Station project photographReal project · Binduli
Western Australia · Operating mine

Binduli Hybrid Power Station

Solar, storage and existing diesel generation integrated at Norton Gold Fields. Sunterra’s role covered design, construction, project management, commissioning and generator-control integration.

3.2 MW solar PV2.5 MW PCS / 5 MWh storageExisting 11 kV network

Stage II project figures. Joint EPC delivery included Long King supplying equipment.

Explore the project story →

Utility-scale project background

Wagerup BESS

A historical project appointment and the owner’s current status are recorded separately.

Historical construction photograph used on Sunterra’s Wagerup project referenceHistorical construction photograph
Western Australia · Project reference

Wagerup Battery

100 MW / 200 MWhOwner: Alinta Energy

Alinta Energy announced the joint appointment of SEPD and Sunterra in August 2023. Its October 2026 update reports that the battery is operational, with commercial operation commencing in September.

The original appointment and the owner’s later operating update describe different project stages. This reference does not attribute all subsequent completion works to Sunterra.

Project planning

Questions to resolve early.

Is this the same as a commercial battery package?

No. Utility storage is specified around project-scale electrical interfaces, operating requirements and contracted responsibilities. The commercial MID/APX package is a separate solution.

Is a particular battery brand included?

No standard product or capacity is assumed here. Equipment selection and compatibility are confirmed through the project’s engineering and procurement process.

Can a BESS provide backup or grid-forming operation?

These functions require suitable equipment, controls, protection and an agreed electrical design. They are not automatic features of every battery installation.

Your next energy project

Start with the site. Define the scope.

Share your project stage, electrical interfaces, available studies and operating priorities. Let’s discuss the right next conversation.