Wollar Solar Farm
A large NSW solar asset with Sunterra’s EPC and ongoing O&M role.
Project delivery and operating responsibilities are explained in the full case study.
Explore solar, storage, hybrid integration and ongoing asset care through project references with their roles, capacities and stages clearly identified.
Binduli · Project photograph
Filter by project area, then open the detailed story or documented reference.
Showing 3 project references.
A large NSW solar asset with Sunterra’s EPC and ongoing O&M role.
Project delivery and operating responsibilities are explained in the full case study.
Solar, storage and diesel-generation control integration at an operating mine.
Stage II figures. Sunterra’s role included system integration and commissioning; equipment supply formed part of the joint EPC arrangement.
Alinta Energy’s utility battery project, for which SEPD and Sunterra were jointly appointed in 2023.
The owner reported operation in October 2026. The original appointment is distinguished from later completion activities.
Distinguish EPC delivery, equipment supply, system integration and ongoing service responsibilities.
Appointments, construction, energisation, commissioning and operation are separate milestones.
Project-specific outcomes and published records do not establish a guarantee for another site.
Share your project stage, electrical interfaces, available studies and operating priorities. Let’s discuss the right next conversation.